MOLINO-II: Model for Assessing Pricing and Investment Strategies for Transport Infrastructure.

Auteur(s)
De Palma, A. Proost, S. & Loo, S. van der
Jaar
Samenvatting

Cost benefit analysis plays a central role in planning and investment decisions related to transportation. Yet this process is often difficult to control and check by an outsider. We propose here a new engineering-economic based tool, MOLINO-II, to perform cost benefit analysis of transport projects and regulations in a network and multi-period context. MOLINO-II performs cost benefit analysis for different transport modes and types of freight and/or passenger traffic, peak and off-peak time periods, diverse market structures and various financing schemes. Congestion levels and tolls are computed endogenously. MOLINO-II also takes into account uncertainty in demand and cost parameters.

Publicatie aanvragen

5 + 1 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 44078 (In: C 43862 CD-ROM) /72 / ITRD E839941
Uitgave

In: Compendium of papers CD-ROM 87th Annual Meeting of the Transportation Research Board TRB, Washington, D.C., January 13-17, 2008, 33 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.