Multi-year Pavement Rehabilitation Need Analysis.

Auteur(s)
Gao, B. & Tsai, Y.
Jaar
Samenvatting

It is crucial for transportation agencies to determine funding needed for maintaining their pavement systems at a desirable level of performance. A consistent and transparent multi-year pavement rehabilitation need analysis would serve a vital role for planning and for funding justification. A multi-year pavement rehabilitation need analysis system was developed for and implemented by the Georgia Department of Transportation (GDOT) to conduct analyses for such purposes. This system integrates network level requirements, such as acceptable statewide pavement performance composite rating, with project level actions on when, where, and what to treat pavement projects. The analysis performed by the system can take into account various requirements and constraints, such as to achieve certain pavement performance level and to balance the funding or pavement performance among GDOT Engineering Districts and the State Congressional Districts. Examples of determining 5 years (2003-2007) pavement rehabilitation funding needs based on different requirements for GDOT are presented. The analyses were based on the actual year 2002 GDOT statewide pavement condition survey data. The benefits of the proposed system are summarized, and the recommendations for future research are also discussed. For the covering abstract see ITRD E135448.

Publicatie aanvragen

2 + 8 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 42857 (In: C 42760 CD-ROM) /50 /60 / ITRD E136319
Uitgave

In: CD-DURBAN : proceedings of the XXIIth World Road Congress of the World Road Association PIARC, Durban, South Africa, 19 to 25 October 2003, Individual Papers Strategic Theme 4. 2004. 10p (9 Refs.)

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.