National highway safety program management and reporting system. Volume IV: Implementation

Auteur(s)
Peat, Marwick, Mitchell & Co.
Jaar
Samenvatting

The suggested management and reporting system (M&RS) implementation strategy involves a pilot implementation in two states and, on the basis of this experience, nationwide implementation of the system. Figure I depicts the time relationship between the suggested 2-state and nationwide implementation. It should be noted that the nationwide implementation commences 8 months after the 2-state implementation has begun, the 2-state and the nationwide implementation run in parallel for 14 months, and the nationwide implementation is completed 14 months after the accomplishment of the 2-state implementation.

Publicatie aanvragen

11 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
A 9012
Uitgave

Washington, D.C., U.S. National Highway Safety Bureau NHSB, 1970, 63 p., tab.; NTIS PB 192916

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.