A note on some methods for priority determination for roadworks.

Auteur(s)
Burton, R.W.
Jaar
Samenvatting

In this report the possibilities of devising a simple formula for the assessment of road improvement priorities are discussed. As the object in allocating priorities to ensure that the needs of the road user are met, these needs must clearly be known road needs determination and priority assessments are seen therefore as are integrated process in which the de termination of road needs logically preceeds the priority allocation suggested steps to be followed in the setting up of a procedure for the rational allocation of priorities are set out.

Publicatie aanvragen

7 + 7 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
A 1601 fo
Uitgave

Pretoria, South African Council for Scientific and Industrial Research / National Institute for Road Research, 1967, 40 p.; Road Economics ; RE/8/67/investigated.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.