OPTIMAL POLICIES OF STAGE CONSTRUCTION FOR TRANSPORTATION FACILITIES UNDER UNCERTAINTY.

Auteur(s)
Venezia, I.
Samenvatting

IN THIS PAPER A METHOD IS PRESENTED FOR FINDING OPTIMAL POLICIES OF STAGE CONSTRUCTION FOR TRANSPORTATION FACILITIES UNDER UNCERTAINTY. UNDER POLICIES OF STAGE CONSTRUCTION, THE TRANSPORTATION FACILITY IS BROUGHT TO ITS ULTIMATE STANDARD IN STAGES, AND IS IMPROVED AT EACH STAGE. THE MAIN FEATURE WHICH DISTINGUISHES THE ANALYSIS FOR THE CASE WHERE CERTAINTY EXISTS FROM THE CASE WHERE UNCERTAINTY PREVAILS IS THE FOLLOWING. UNDER CERTAINTY, THE DECISION MAKER MAY DECIDE IN ADVANCE (I.E. AT THE ORIGIN) THE OPTIMAL PERIODS AT WHICH THE TRANSPORTATION FACILITY SHOULD BE UPGRADED. HE WILL NOT SUBSEQUENTLY CHANGE HIS DECISION. HOWEVER, WHEN UNCERTAINTY PREVAILS, THE DECISION MAKER SHOULD NOT COMMIT HIMSELF AT THE ORIGIN TO UPGRADE THE TRANSPORTATION FACILITY AT ANY SPECIFIC TIME IN THE FUTURE. THUS, AT ANY PERIOD OF TIME THE DECISION MAKER WILL REVIEW THE RELEVANT INFORMATION. BASED ON THIS INFORMATION, HE WILL DECIDE WHETHER TO UPGRADE THE TRANSPORTATION FACILITY, OR FURTHER POSTPONE THIS DECISION. IT IS SHOWN HOW THE OPTIMAL UPGRADING POLICY MAY BE OBTAINED, AND HOW CHANGES IN UNCERTAINTY AFFECT THE OPTIMAL POLICY. USE IS MADE OF THE MODEL TO FIND UNDER UNCERTAINTY THE OPTIMAL STAGE CONSTRUCTION POLICY FOR AN EXISTING ROAD. THE SOLUTION IS COMPARED TO THE ONE OBTAINED UNDER CERTAINTY.(Author/publisher).

Publicatie aanvragen

1 + 9 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
I 230936 /72 / IRRD 230936
Uitgave

Transportation Research. 1977/12. 11(6) Pp377-83 (3 Tbls.; 15 Refs.)

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.