The Oresund link toll collection system.

Auteur(s)
Tveit, B.O.
Jaar
Samenvatting

By the time of the 7th ITS congress, the Oresund link toll collection system had been in operation for just over 4 months. The bridge, which was inaugurated by HRH the Queen of Denmark and HRH the King of Sweden on July 1st this year, represents the realisation of an old dream sustained over centuries by people on both sides of the Sound. The link, connecting Scandinavia to the European continent, will play an important part in the shaping of a new and powerful region of education, commerce and industry. This paper presents the technical solutions implemented, as well as the experiences from the commissioning phase and the first four months of regular operations.

Publicatie aanvragen

6 + 5 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 23123 (In: C 22454 CD-ROM) /10 /73 / ITRD E115208
Uitgave

In: From vision to reality : proceedings of the 7th World Congress on Intelligent Transportation Systems ITS, Turin, Italy, 6-9 November 2000, 5 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.