Performance budgeting system for highway maintenance management.

Auteur(s)
Jorgensen, R.
Jaar
Samenvatting

The primary object of this study was to develop a model performance budgeting system for highway maintenance, thereby considering factors of work load, criteria for establishment of maintenance levels, procedures for management planning, evaluation, and control. Simplicity and economy of installation and operation of the system were also considered.

Publicatie

Bibliotheeknummer
B 2254 [electronic version only] /10/60/ IRRD 206466
Uitgave

Washington, D.C., Highway Research Board HRB, 1972, 213 p., fig., graph., tab., ref.; NCHRP Report No. 131.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.