Performance during construction of a cut-and-cover tunnel founded in London Clay at Edmonton. Prepared for the Highways Agency, Quality Services (Civil Engineering).

Auteur(s)
Carder, D.R. Barker, K.J. & Easton, M.R.
Jaar
Samenvatting

Field instrumentation was installed to investigate the performance of the diaphragm walls of Fore Street Tunnel at Edmonton. The tunnel was founded in over-consolidated clay and constructed top down with an integral roof and carriageway prop slab. Field observations of wall movements and bending moments, loads and moments in the props, and vertical streses in the clay beneath the carriageway prop slab were taken at the various construction stages. The measured values were compared with those predicted from finite element analysis using a soil model based on the Mohr-Coulomb yield criterion. The measured and predicted loads and moments in the structural members were also compared with those which would be determined using current design procedures. (A)

Publicatie

Bibliotheeknummer
C 12652 [electronic version only] /25 / IRRD E100455
Uitgave

Crowthorne, Berkshire, Transport Research Laboratory TRL, 1999, IV + 26 p., 15 ref.; TRL Report ; No. 379 - ISSN 0968-4107

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.