Performance of Induced Trench Culverts in New Brunswick.

Auteur(s)
Hansen, P. Miller, L. Valsangkar, A.J. Bourque, S. & MacLeod, T.
Jaar
Samenvatting

The induced trench method of culvert construction has been in use for over 80 years. In spite of its long history, the induced trench method of design and construction is viewed with skepticism because of many simplifying assumptions used in the design method. The latest edition (2000) of the American Concrete Pipe Association Handbook has deleted this method reflecting the current reservations about this method of construction. In response to some of these recent concerns, an inspection program was implemented by the New Brunswick Department of Transportation (NBDoT) in the summer of 2001 to assess the performance of induced trench installations. Each installation was visually inspected for signs of structural distress or any other signs of failure. In this paper, the results of this inspection and analysis of the resulting data are presented. It is concluded that induced trench construction results in a significant savings and the design methods and construction details used by NBDoT result in buried conduits which satisfy serviceability limit states. For the covering abstract of this conference see ITRD number E216511.

Publicatie aanvragen

18 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 42363 (In: C 42299 CD-ROM) /26 / ITRD E216583
Uitgave

In: Transportation : an economic enabler : proceedings of the 2007 annual conference and exhibition of the Transportation Association of Canada TAC, Saskatoon, Saskatchewan, Canada, October 14-17, 2007, 14 p., 9 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.