Performance of an integral bridge over the M1-A1 Link Road at Bramham Crossroads. Prepared for the Highways Agency, Quality Services (Civil Engineering).

Auteur(s)
Barker, K.J. & Carder, D.R.
Jaar
Samenvatting

This report describes the construction of an integral bridge on the M1-A1 Link Road. The bridge deck has two spans totalling approximately 50m and comprises prestressed concrete beams composite with a 200mm thick reinforced concrete slab. The deck is structurally connected to full height reinforced concrete abutments. Field instrumentation and measurements during construction are described together with seasonal effects arising from thermal expansion of the deck during its first three years in service. The findings are relevant to further updating of BA42 (DMRB 1.3) on the design of integral bridges. (Author/publisher)

Publicatie

Bibliotheeknummer
C 20536 [electronic version only] /53 / ITRD E112192
Uitgave

Crowthorne, Berkshire, Transport Research Laboratory TRL, 2001, IV + 38 p., 9 ref.; TRL Report ; No. 521 - ISSN 0968-4107

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.