Planning of Second N-S Freeway (Kuanhsi-Hsinshu section) in Taiwan.

Auteur(s)
Chi, E.F. Ou, C.D. & Chang, J.K.
Jaar
Samenvatting

In order to relieve the traffic congestion on the existing Chung Shan Freeway it was decided by the government in 1985 that a second freeway be built in the northern region of Taiwan, ROC, with a total length of 86.5 km. Moh and Associates, Inc. was responsible for the planning and design of the southernmost section with section length of 20.4 km, running from Kuanhsi to Hsinchu. The route corridor of the section crosses undulating terrain with complex geological conditions. The topographical and geological conditions are two of the major features, such as route selection, slope stabilization and its protection, structure types, and landscaping -related highway engineering. In addition, modern design concepts and addition, modern design concepts and new construction methods were introduced with care, including the use of a computer-aided design and drafting (CADD) program system. (A)

Publicatie aanvragen

1 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 6648 (In: C 6625) /21 /41 /72 / IRRD 823283
Uitgave

In: Proceedings of the sixth conference of the Road Engineering Association of Asia and Australasia (REAAA), Kuala Lumpur, 4-10 March, 1990 : Volume 3, Session 12, Paper 1, 14 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.