Planning for uncertain future.

Auteur(s)
Himanen, V.
Jaar
Samenvatting

The last hundred years can be divided to three periods, two stable and one unstable. With the energy crisis a new unstable period has started. This has a major influence in transportation planning. However, the efforts to find solutions for the problems of today traffic and to the problems of near future must continue. There is large variation in the forecasts for next 20-30 years. These forecasts are needed when planning major transportation facilities. The lifespan of roads and railways is hundreds of years, which must be considered, in planning.

Publicatie aanvragen

1 + 4 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 20805 (In: B 20796) /72/ IRRD 257872
Uitgave

In: Roads into the future : documentation 9th IRF World Meeting, Stockholm, June 1-5, 1981, Session TS-6, p. 119-126, 4 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.