Precast posttensioned abutment system and precast superstructure for rapid on-site construction.

Auteur(s)
Scanlon, A. Aswad, A. & Stellar, J.
Jaar
Samenvatting

A prefabricated bridge system was designed to minimize on-site construction time. The system consists of a double-cell adjacent box beam superstructure supported on precast posttensioned abutment units on cast-in-place footings. The design concept was implemented in a demonstration bridge replacement project, a single-span bridge crossing a creek in southwestern Pennsylvania. The construction project demonstrated the feasibility of the design concept as a means to reduce construction time by eliminating cast-in-place concrete for abutment walls.

Publicatie aanvragen

1 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 29951 (In: C 29943 S [electronic version only]) /24 / ITRD E822814
Uitgave

In: Design of structures 2002 : bridges, other structures, and hydraulics and hydrology, Transportation Research Record TRR 1814, p. 65-71, 2 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.