A preliminary study of cost of tunnel construction.

Auteur(s)
Margason, G. & R.G. Pocock.
Jaar
Samenvatting

A preliminary study has been made to obtain information on the broad breakdown of the price of driven-tunnel construction. Only the direct engineering prices of construction are discussed and no consideration is given to any indirect costs or benefits associated with sub-surface roads.

Publicatie

Bibliotheeknummer
A 5595 [electronic version only] IRRD 50629
Uitgave

Crowthorne, Road Research Laboratory RRL, 1970, 38 p., ref.; RRL Report 326

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.