Principles of the staged construction planning on highway.

Auteur(s)
Yoshida, S. Minoura, M. & Yashiro, A.
Jaar
Samenvatting

Staged construction in this study is to be one of the construction methods of roadlanes;generally this planning is applied to final 4- lane highway construction in which the first stage is opened to traffic as two- lane- two way highway, and while allowing through traffic the second stage is supplemented by adding the next 2- lane- roadway.Although staged construction is recognised economical in case of low traffic volume, it brings forth some problems to be checked upon.

Publicatie aanvragen

1 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 27604 (In: B 27589 [electronic version only]) /10 /52 /73 / IRRD 289342
Uitgave

In: Proceedings of the 13th ARRB- 5th REAAA Combined Conference, Adelade, August 25- 29, 1986. Roads- appropriate technology. Traffic, planning and safety. Vol 13. Proceedings- Past 2, p.131- 139.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.