Recent progress in short-range traffic prediction.

Auteur(s)
Ben-Akiva, M. Cascetta, E. Gunn, H. & Whittaker, J.
Jaar
Samenvatting

This paper describes work in progress on the development of practical and accurate forecasting methods for the DYNA project for developing, implementing and testing a real-time traffic model for inter-urban motorway networks. It was decided to apply the following methods in parallel, and merge their results: (1) a statistical model, using a state space/Kalman filter approach with explicit feedback of prediction errors; and (2) a dynamic traffic assignment model, working with a dynamic origin-destination (OD) prediction method. Model (1) was expected to be most accurate for between one and 15 minutes ahead, while model (2) was expected to be more accurate for between 15 and 60 minutes ahead. The paper ahead. The paper discusses: (1) the proposed system architecture; (2) OD estimation and prediction; (3) dynamic traffic assignment; (4) the component parts of the statistical model; and (5) the merging of very short and short-term traffic predictions. So far, the project has specified the algorithms and designed the software in detail, and tested the models against actual measurements. The present model structure is provisional, and indicates a framework for development of the eventual final model.

Publicatie aanvragen

7 + 11 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 6251 (In: C 6202) /72 / IRRD 870015
Uitgave

In: Compendium of technical papers presented at the 63rd annual Institute of Transportation Engineers ITE meeting, The Hague, The Netherlands, September 19-22, 1993, p. 262-265, 4 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.