Reconsidering freeway bottlenecks : case studies of bottleneck removal projects in Texas.

Auteur(s)
Walters, C.H. Cooner, S.A. & Ranft, S.E.
Jaar
Samenvatting

Implementing minor geometric and operational improvements on existing freeways to remove bottlenecks has the potential of achieving high benefits, yet it is not routinely done. Four case studies of bottleneck removal projects in Texas are presented in some detail with before-and-after evaluations of speeds, volumes, and crash histories. The case is made that many benefits may be realized for little cost. In addition, evaluations of nine other bottleneck removal projects are included in summary tables. Benefit-cost ratios as high as 400:1 have been found, with the lowest ratio being 9:1; costs ranged from $8,000 to $2.45 million. Injury crash rates were substantially lower after the bottleneck removal in almost all cases (average reduction of approximately 35%); however, an increase in crash rate was noted in one of the 13 cases.

Publicatie aanvragen

2 + 8 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 50549 (In: C 50548 S [electronic version only]) /73 / ITRD E837544
Uitgave

In: Freeway operations, high-occupancy vehicle systems, traffic signal systems, and regional transportation systems management 2005, Transportation Research Record No. TRR 1925, 2005, p. 66-75, 11 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.