Redevelopment of the Peace Bridge Plaza and border crossing at Fort Erie, Canada.

Auteur(s)
Tansley, G.D.
Jaar
Samenvatting

This paper outlines the design and construction of improvements to the Peace Bridge Border Crossing at Fort Erie, Ontario. The paper briefly describes the evolution of the Border Crossing from its inception in 1927 to the present, and describes the various components of the Border Crossing, their relationship to each other and how the design of the Plaza is affected by the operation of these components. The paper outlines the concept of Shared Border Management and how this concept will affect the design of Border Crossings in the future. For the covering abstract of the conference see ITRD nuber E211521.

Publicatie aanvragen

1 + 5 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 38362 (In: C 38346 CD-ROM) /21 / ITRD E211533
Uitgave

In: Transportation without boundaries : proceedings of the 2006 annual conference and exhibition of the Transportation Association of Canada TAC, Charlottetown, Prince Edward Island, Canada, September 17-20, 2006, 21 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.