Samenvatting
An extensive data base was obtained from 4 two-lane locations in Toronto. The data was 5-minute detector counts in each base of each location for a total of 13.291 counts over 77 days. The paper reports on the regularity of the weekday pattern, and of the time at which certain flow levels are reached. The correlation between flows in the two lanes is studied. A significant correlation is found, particularly at higher volumes.