Replacement of elastomeric bearings and installation of monitoring systems thereafter at Keppel Viaduct in Singapore.

Auteur(s)
Tan, K.L.
Jaar
Samenvatting

The paper makes an attempt to present a case study on the replacement of elastomeric bearings and installation of monitoring systems thereafter on an elevated Keppel Viaduct in Singapore. The content covers essential background for understanding the causes contributing to the slipping of the elastomeric bearings, the study and design analysis work, considerations for bearings replacement and its operations, selection and installation of adequate monitoring systems thereafter and all other related works contributing to the successful completion of the work in the most efficient and safe manner. (Author/publisher) For the covering entry of this conference, please see ITRD abstract no. E208431.

Publicatie aanvragen

9 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 27061 (In: C 26913 CD-ROM) /24 / ITRD E209409
Uitgave

In: Transport: our highway to a sustainable future : proceedings of the 21st ARRB and 11th REAAA Conference, Cairns, Queensland, Australia, 18-23 May 2003, 18 p., 2 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.