Resurfacing roads using ultra high-pressure watercutting.

Auteur(s)
Waters, J.C. & Pidwerbesky, B.D.
Jaar
Samenvatting

The safety of road users is of primary importance for the New Zealand State Road Authority so key drivers for resurfacing are surface friction and texture depth to optimise the surface friction of pavements. Traditionally the repair method for a surface friction-deficient, or texture-deficient surface is the application of a new surfacing layer. There are several techniques for resurfacing these deficient sites that simply recycle the existing surface. These include mechanical retexturing, waterblasting and ultra high-pressure (UHP) watercutting. This paper describes the evolution of the UHP watercutter from its use solely for preseal repairs to its success as a resurfacing technique for microtexture and macrotexture deficient surfaces. Included in the paper are descriptions of laboratory experiments and case studies describing the performance of resurfaced sites more than four years after treatment. The paper explains conditions that affect the performance of texture restoration utilising ultra high-pressure (UHP) watercutting, and concludes that the effectiveness of the UHP watercutting is variable but can be up to five years in some situations. (a) For the covering entry of this conference, please see ITRD abstract no. 0612AR242E.

Publicatie aanvragen

12 + 2 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 39006 (In: C 38917 CD-ROM) /61 / ITRD E214588
Uitgave

In: Research into practice : proceedings of the 22nd ARRB Conference, Canberra, Australia, 29 October - 2 November 2006, 10 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.