Risk management of highway embankments constructed over soft ground.

Auteur(s)
Hsi, J.
Jaar
Samenvatting

A large portion of the Yelgun to Chinderah Freeway was located in areas underlain by soft soils. Construction of the road embankments in these areas presented significant constraints and risks to the project, involving short term instability and long term settlement. Due diligence was carried out to ensure development of effective solutions and control and reduction of risks. A risk management system was implemented integrating design, construction, and field testing and monitoring to achieve the stringent project requirements. The design and construction were constantly reviewed and modified as required in response to the field performance. This process allowed flexibility in design and construction and was proved to be successful and cost effective. (Author/publisher) For the covering entry of this conference, please see ITRD abstract no. E208431.

Publicatie aanvragen

14 + 4 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 26943 (In: C 26913 CD-ROM) /21 / ITRD E209291
Uitgave

In: Transport: our highway to a sustainable future : proceedings of the 21st ARRB and 11th REAAA Conference, Cairns, Queensland, Australia, 18-23 May 2003, 15 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.