A road needs study : the national primary routes.

Auteur(s)
Devlin, J. McCarth, C. & McGuinness, P.
Jaar
Samenvatting

Projections are made of future traffic flows the National Primary Route Network for the years 1985 and 1995 in Ireland. The effect of applying capacity criteria for three different levels of service is examined for specifications. Design hour operating speeds, overall travel time and construction costs are deduced for each alternative and these and other details are set out an graphs, tables and maps.

Publicatie aanvragen

6 + 6 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 8843 /10/20/
Uitgave

Dublin, The National Institute for Physical Planning and Construction Research, 1974., 74 p., fig., graph., tab., ref.; An Foras Forbartha Teoranta RT-126