A study of some factors affecting bus service performance.

Auteur(s)
Jackson, R.L. Coe, G.A. & Finnamore, A.J.
Jaar
Samenvatting

Various measures aimed at improving the operation of a bus service have been examined using the results of TRRL surveys and simulation modelling. Service 9 of the Bristol omnibus company was chosen as a basis for the study. The main findings were: (i) in the evening peak period improved time-keeping could reduce the mean passenger waiting time by 5 per cent; (ii) reducing bus-boarding times to the lowest values observed elsewhere in the united kingdom could bring about reductions of 8 per cent in the mean waiting time and 10 per cent in the mean on-bus travel time in the evening peak period; (iii) when there was a persistent need for cancellations, waiting times could be reduced by rescheduling designed to make the scheduled complement compatible with available resources: when an average of one bus was missing from the service considered, the reduction was estimated to be of the order 10 per cent of the waiting time for a full service, in both peak and off-peak periods; (iv) use of more realistic run-time allocations would generate closer adherence to schedule: in the evening peak period this might reduce the mean waiting time by between 3 and 8 per cent. (Author/publisher)

Publicatie

Bibliotheeknummer
C 39702 [electronic version only] /72 / IRRD 227487
Uitgave

Crowthorne, Berkshire, Transport and Road Research Laboratory (TRRL), 1977, 28 p., 8 ref.; TRRL Laboratory Report ; LR 767

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.