Sydney-Brisbane land transport.

Auteur(s)
Laird, P.
Jaar
Samenvatting

This paper commences with reference to the draft AusLink Sydney-Brisbane corridor strategy. Section 2 outlines the upgrading of the Pacific Highway and section 3 examines the existing Sydney-Brisbane railway. Section 4 outlines some 2009-2014 corridor upgrade options, with particular attention to external costs and energy use as opposed to intercity supply chain costs, and the conclusions are given in section 5. (a) For the covering entry of this conference, please see ITRD abstract no. E216058.

Publicatie aanvragen

15 + 5 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 48581 (In: C 48575 [electronic version only]) /72 / ITRD E215988
Uitgave

In: ATRF07 : Managing transport in a climate of change and uncertainty: proceedings of the 30th Australasian Transport Research Forum (ATRF) 2007, Melbourne, 25-27 September 2007, 14 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.