Ten-year performance of dowel-bar retrofit: application, performance, and lessons learned.

Auteur(s)
Pierce, L.M. Uhlmeyer, J. Weston, J. Lovejoy, J. & Mahoney, J.P.
Jaar
Samenvatting

The Washington State Department of Transportation (WSDOT) has been rehabilitating its aged portland cement concrete pavements over the last 10 years by using dowel-bar retrofit, panel replacements, and diamond grinding. These pavements have been rehabilitated, with dowel-bar retrofit, to extend the performance life beyond the original design life of 20 years. The first dowel-bar retrofit application in Washington was constructed as a test section in 1992. Since then, WSDOT has dowel-bar retrofitted more than 350 lane-kilometers. Dowel-bar retrofit performance and application are described, and lessons learned in the last 10 years are discussed.

Publicatie aanvragen

7 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 33132 (In: C 33122 S [electronic version only]) /22 /23 / ITRD E828683
Uitgave

Transportation Research Record. 2003. (1853) pp83-91 (6 Phot., 4 Fig., 2 Tab., 8 Ref.)