Time and weather provisions in construction contracts of state highway agencies.

Auteur(s)
Hinze, J. & Couey, J.
Jaar
Samenvatting

A thorough examination was conducted of the provisions of the construction contract documents of all state highway agencies (SHAs). The study focused on the varying practices of these agencies concerning the inclusion of time and weather provisions in their construction contracts. Results show a wide variability between the various SHAs on most topic areas examined. Although regional differences can explain some of this variability, other provisions appear to be different for no apparent or obvious purpose. A greater degree of consistency between the various state construction contracts of these agencies is advised. Contractors must also be aware of these differences so that they are fully informed about the implications of entering into agreements with SHAs.

Publicatie aanvragen

11 + 2 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 25252 (In: C 25243 S) /32 / IRRD 834576
Uitgave

In: Concrete and construction : new developments and management, Transportation Research Record TRR 1234, p. 57-63

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.