Toledo's new signature structure.

Auteur(s)
Ciolko, A. & Mehrabi, A.
Samenvatting

A $220 million bridge in Toledo, Ohio, features a one-of-a-kind design incorporating several unique new features of cable-stayed technology. Once completed, the Maumee River Crossing will be the second tallest structure in Toledo, and a stunning addition to the city's skyline. This article provides an overview of the 1,225 ft Maumee River Bridge, with its single soaring 404 ft tall pylon inlaid with shatter-resistant glass on each of its 4 sides. By day, the glass will reflect the skyline of Toledo, while at night, the reflective surface will be backlit with dramatic lighting arrays capable of changing color displays.

Publicatie aanvragen

3 + 11 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
I E821004 /24 / ITRD E821004
Uitgave

Public Roads. 2002/09. 66(2) pp30-34 (8 Phot.)

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.