Traffic enforcement strategies in work zones : interim report

Auteur(s)
Ullman, G.L. Schrock, S.D. Brewer, M.A. Sankar, P. Bryden, J.E. Corkran, M. & Hubbs, C.W.
Jaar
Samenvatting

This report presents the summary of work conducted during Phase I of NCHRP Project 3-80, Traffic Enforcement Strategies for Work Zones. The objective of this project is to develop guidelines for safe and effective deployment of traffic enforcement strategies in work zones on high-speed roadways (those with speed limits of 45 mph or greater). Phase I activities were designed to provide a clear understanding of the national state-of-the-practice on this topic, to determine existing knowledge gaps and research needs, and to develop a clear research plan to meet those needs. The conclusions of the research will be used to develop a comprehensive guideline document that can be used by design, construction, maintenance, and traffic engineers to incorporate traffic law enforcement in work zones. (Author/publisher)

Publicatie aanvragen

1 + 6 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 39567 [electronic version only]
Uitgave

[College Station, TX, Texas A & M University, Texas Transportation Institute TTI], 2006, VI + 271 p., 71 ref.; Report Phase I of NCHRP Project 3-80

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.