The municipalities of the metropolitan area in Barcelona, which are closer to the central city, have a functional dependence with Barcelona, which has been stressed due to the continuous urban development that these cities have had in the second half of the XXth century. The area surrounding the river Llobregat in its final stretch has been one of the most populated zones in Barcelona metropolitan area. The municipalities of Esplugues de Llobregat, Cornellá de Llobregat, Sant Joan Despí and Sant Just Desvern, where the tramway is implemented have a population of more than 175.000 inhabitants. In 1987 the first feasibility studies were made and finally in 2000 under the ATM (Public Transport Authority in the area of Barcelona), the contract was awarded to a consortium, which constructed and started the operation in 2004. A twin system was developed in the zone of Trambesos atthe north of the city. The contract was awarded under a BOT scheme with aperiod of 25 years. Two companies were created (Tramvia Metropolità y Tramvia Metropolità del Besòs) which are cohnstituted in different proportions by Constructors and manufacturers (FCC, Acciona, Alstom, Comsa), Financing groups (Banco de Sabadell, Société Genérale) and operators (Detren - Connex, Sarbús ). The awarded consortium creates then basically two subcontracts: one with a construction company during the construction period, and the other with the operator company, during the rest of the concession. Inthis two companies the partners of the original consortium participate indifferent proportions, according to the specialities of the subcontracts.The project has been developed under a Project Finance structure which makes possible that the Public sector funds at long term with a technical tariff, incorporating several commercial and industrial risks and also quality commitments. This is a major advantage of this scheme and after Barcelona it has been applied in other projects. Nevertheless several disadvantages appear, such as: Different objectives between the constructors and operators which may have an influence in several issues, including the qualityof the civil work; Duplication of functions and resources in some cases in the consortium and in the subcontracting companies; Difficulties of relations between the different parties. Particularly the assignment of responsibilities is a major issue. It is very illustrative to analyse the case of the tramways in Barcelona, since several other tenders have been made with a similar model (Metro of Sevilla, Málaga, tramway of Parla, etc.). Each case has its own problems and solutions, but in general there seems to be a tendency to leave this type of BOT contracts and develop operating contracts which can incorporate an infrastructure toll in order to get back the investment made initially. This tries also to be linked to some type ofcommercial or availability risks to fulfil the SEC'95 requirements. For the covering abstract see ITRD E135582.

Publicatie aanvragen

6 + 14 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 46287 (In: C 46251 [electronic version only]) /72 / ITRD E135833
Uitgave

In: Proceedings of the European Transport Conference ETC, Strasbourg, France, 18-20 September 2006, 15 p.