USING EARLY PERFORMANCE TO PROJECT TRANSIT ROUTE RIDERSHIP : COMPARISON OF METHODS

Auteur(s)
FOERSTER, JF IMLAY, N
Samenvatting

The performance of eight models for predicting ridership levels on new transit routes by using early performance data is summarized.Seven of the models are based on least-squares estimates of linear and nonlinear functions; the eighth model is a manual method based on quarterly ridership statistics. Coparisons are based on r-square statistics, leverage estimates, and ability to predict ridership levels for the second year of operation. The results of these coparisons indicate that (a) forecasts based on less than 6 months of data are unreliable for all conventional statistical models, (b) a simple manual method based on prior experience with other local routes is more effective than least-squares models if ridership forecasts must be produced on the basis of limited amounts of data, and (c) probit-, logit-, and power-function and linear-log models perform acceptably if more than 6 months of data are used. This paper appears in transportation research record no. 1209, Transit administration and planning research.

Publicatie aanvragen

6 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
I 831873 IRRD 9008
Uitgave

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1989-01-01 1209 PAG:37-39 T5

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.