Using a pavement management system in a transportation master plan process.

Auteur(s)
Cepas, A. & Szczepanski, P.
Jaar
Samenvatting

In September 1993, Edmonton City Council approved the Terms of Reference for an updated Transportation Master Plan Study. In 1995, it was decided to include pavement management information within the scope of the project. This was made possible by the availability of customized performance prediction models in Version 4.13 of Alberta's Municipal Pavement Management System. Although the MPMS software was designed to run for only a ten year programming period, the data tables were reset at the end of each ten year run to simulate a new set of starting conditions. In this way, it was possible to find: a) the expenditure levels required to maintain current network service levels over the planning horizon, b) the best achievable service levels with unlimited funding, c) the service levels which would result if approved funding trends were maintained, d) the effect of including a reconstruction program on network service levels. Separate runs were made for freeways, arterial truck routes, arterial non-truck routes, collectors, and local streets. Of particular interest was the fact that the existing backlog of rehabilitation and reconstruction needs has a substantial impact on network performance over the longer term. (A)

Publicatie aanvragen

10 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 13144 (In: C 13012 CD-ROM) /10 / IRRD 897011
Uitgave

In: Proceedings of the 13th International Road Federation IRF World Meeting, Toronto, Ontario, Canada, June 16 to 20, 1997, p.-

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.