Website summary of D13 & D14 Report summarising the selection and prioritisation of solutions. Powered two wheeler integrated safety PISa Programme, Deliverable 13 and 14, Task 2.3.

Auteur(s)
McCarthy, M. Halewood, C. Grant, R. Frampton, R. Peldschus, S. Schuller, E. Pierini, M. Savino, G. & Babu, R.
Jaar
Samenvatting

This report presents the processes used to select and prioritise the systems proposed by WP2 for development and testing in the PISa project. This deliverable combines deliverables D13 — Report summarising the selection and prioritisation of solutions and D14 — Report detailing the functions of the proposed systems, in order to simplify the presentation and avoid duplication of information in 2 documents. This process of system selection and prioritisation was based on the accident data which was analysed in the in-depth case review of Task 2.2.1. Deliverable D10 — Report summarising the findings from the in-depth case analysis presents the list of functions that resulted from the case review process. Having determined the functions which could serve as countermeasure interventions for each in-depth accident, it was necessary to consider the possible technical system solutions that would contribute either to accident avoidance and injury avoidance or mitigation. The first step was therefore to define systems which fulfilled the functional requirements. This list of systems was constructed initially at a global level and then at a specific technological level. (Author/publisher)

Publicatie aanvragen

3 + 2 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
20121116 ST [electronic version only]
Uitgave

[Brussels, European Commission, Directorate-General Research], 2008, 3 p.; Contract No. TST5-CT-2006-031360

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.